Helm. mission control

Project mission control

Live state of every software project. Plan of record in git, reviewed via commits.

Building 5

Aethyr

Building

Zoomable canvas file/media OS, pronounced Ether — formerly the Fathom tool idea.

Phase 1 increment 1 — files-on-canvas built against the test corpus, awaiting visual verify on the Cintiq
Next up Michael eyeballs the Files tab (627-file corpus as a zoomable LOD canvas); then folder weight, tap-to-zoom nav, layout persistence; then the P1.5 virtualization spike (tldraw-vs-PixiJS go/no-go).
4/4 features done

Beacon

Building

Real-time, tailnet-private cockpit for every Claude Code session across the fleet — model, machine, status, context %, and browser terminal-attach. Live-ops companion to Helm.

Phase 0 (de-risk) DONE — browser terminal-attach proven on Windows over the tailnet
Next up Phase 1 — status cockpit MVP (hub on the Mac Studio + reporter on every machine).
2/6 features done

Helm

Building

Personal mission-control dashboard for all software projects — this project itself.

Phase 3 interactive Gantt shipped — Phase 4 (optional) next
Next up Phase 4 (optional) — nightly Mac reconciler + weekly vault digest.
4/5 features done

Longwave

Building

Local Shortwave-style email app — Tauri 2 native shell, local FTS5 search, Claude pane, Obsidian task truth.

Active build — Gmail sync rework (stage 2 of 3) + week-one spike designs done
Next up Finish Gmail rework stage 3 (resumable backfill + IDLE), wire the new sync entrypoint, then run the state-layer live spikes (Spike 4 / Proton Bridge APPEND is the go/no-go).
5/5 features done

NAS Archive/Backup

Building

2x Synology 100TB archive/backup — nightly replica + cloud object-lock leg.

Phase 0 — crown jewels now
Next up Confirm NAS1 filesystem (Btrfs vs not) — it gates the whole v3 plan.
1/3 features done

Planned 3

Shipped 3